Inner City Brisbane Flood Repair

Following the 2022 February Flood event, we were engaged to carry out repairs on this property, which had become inundated with flood waters. A full strip out was required, this included full bathroom and kitchen replacement. After engaging our trade network we were able to restore this property to its pre-loss condition. Through consistent communication with the homeowner, we ensured that all targets were met, and reached the common goal of getting them back into the home they love.

‘Watching your home flood is heart-breaking. But to witness it be lovingly brought back to life, even better than it was before is spectacular! That is exactly what happened when Ezy Projects came on board as my builders post flood in April 2022. I had a clear idea of what I wanted and Sean and his team were there supporting my decisions every step of the way and suggesting some fantastic additions I never would have thought of.’

‘Their attention to detail and determination to give me the best quality build was amazing and they were very good at communicating throughout the process. The entire team have been nothing but helpful the whole way and I cannot recommend them highly enough.’

Before

After